952-697-4822
At LI Group our installation team has a variety of different projects we cater to. The team works on every type of install from fixture installs (small end cap fixtures, to large standalone display fixtures) to mobile device and TV installs. We pride ourselves on the quality of work which we provide detailed status reports and deliverables that are quality checked for every project site. Fast-paced with a great ability to increase your speed to market, our team ensures your project is done right and on time. Each project that is completed within LI Group’s installation team has a dedicated Project Manager and Assistant Project Manager throughout the entire process to ensure that execution of the project exceeds our clients expectations. We offer nationwide coverage and are capable to handle any size project.
Since 2012, the rollouts team has successfully completed over 55,000 individual site visits on 300+ projects.
Number of Sites: 859
Timeline: 2 Weeks
LI Group worked with Samsung and Acrylic Design to install a four to six-foot acrylic tabletop display along with multiple mobile devices and graphics at 859 mobile device stores. Samsung utilized multiple LI Group service offerings:
• Rollout Installation
• In-House Vendor Management
• Managed Transportation
Our crews installed four or six-foot acrylic tabletop displays along with multiple mobile devices and graphics at 859 mobile device stores across the nation. The two-recourse teams removed the pre-existing display and devices, cleaned the fixture, placed the new acrylic displays per Samsung’s planogram, installed security pedestals and alarms, set up retail demo mode on each device, installed all devices (phones, tablets, and watches, per Samsung’s planogram, and installed graphics and lightboxes on the display. Li Group’s logistics team provided and coordinated all transportation to ensure all displays were shipped from the manufacture on coordinated schedules to match production and delivered to each site to meet the installation schedule and target deadlines set by Samsung.
Number of Sites: 2,197
Timeline: 6 Weeks
LI Group worked with a large coffee house chain to install new menu boards, brew tap handles, and product marketing badges at 2,197 locations across the nation. Our customer utilized multiple LI Group service offerings:
• Rollout Installation
• Warehousing/Inventory Management & Reporting
• Transportation
• Detailed Status Reports
LI Group’s field resources installed new menu boards, brew tap handles, and product marketing badges at 2,197 coffee house chain locations across the US. The individual installers had to review and analyze each store’s layout, counter type and position of existing taps, and wall type and position of existing menu boards to follow strict placement guidelines set by our customer. LI Group’s logistics team provided and coordinated all shipments to each installation crew on a weekly basis. The team managed eight different SKUs and 94 strategic warehouses/pick up points across the country. Installers visited each pick-up point multiple times per week to replenish their materials stock. Inventory was tracked and managed so that installers always had the proper amount of each SKU. This ensured that each site’s unique layout could be accommodated and installs could take place on schedule. Accurate QC of install deliverables, maintenance of inventory levels, precise fulfillment, and transfer of material between installers led to no additional inventory requests and allowed us to consolidate and return all excess inventory back to the customer to utilize across other programs.
Number of Sites: 191
Timeline: 5 Days
LI Group worked with Walgreens to install a new accessories end cap fixture at 191 locations. Walgreens utilized multiple LI Group service offerings:
• Rollout Installation
• In-House Vendor Management
• Managed Transportation
LI Group’s crews installed a new accessories end cap fixture at 191 locations across the nation. The two resource teams installed the fixture, fact/pricing tag holder, and peg hooks. Crews also removed the pallet, cardboard, and other debris offsite to dispose of. LI Group’s logistics team provided and coordinated all transportation to ensure all end caps were shipped from the manufacturer on coordinated schedules and delivered to each site to meet the installation schedule and target deadlines set by Walgreens. The LI Group project management teams were in constant contact with Walgreens to ensure all project goals were met on time.
Number of Sites: 5,300
Timeline: 4 Months
LI Group worked with Samsung and an east coast manufacturer to install a home appliance end cap fixture at over 5,300 locations at six major big-box retailers. Samsung utilized multiple LI Group service offerings:
• Rollout Installation
• In-House Vendor Management with onsite presence at the manufacture’s facility to ensure QC and proper loading of trucks
• Managed Transportation
• Detailed Status Reports for each individual retailer
LI Group’s crews installed home appliance end caps at over 5,300 locations across six major big-box retailers. The two-resource teams assembled the fixture, installed the monitor and touchpad, set up media content, and set the washer and dryer in place. LI Group’s logistics team provided and coordinated all logistics to ensure 250 fixtures per day were transported from the manufacturer on coordinated schedules to match production and delivered to each site to meet the rapidly changing installation schedule. The project management team held daily meetings and communicated with the manufacturer, customer, and installation teams to production schedules, retailer schedules, retailer blackout dates, and Samsung target dates all aligned with the shipping and installation schedules.